Application
Installation of a complete piping system for a desulphurisation plant at a coal-fired power station.
Characteristics
The complete installation comprised approximately 3000m of FRP pipe, with diameters between DN25 and DN900.
PH Technology was responsible for the supply and installation of the system, including its associated support structures.
It was also responsible for the flexibility analysis of the DN900 diameter recirculation pipes.
Operating Conditions
The design specifications were a maximum pressure of 9 bar, and a maximum temperature of 100ºC.
Material
The pipes were made of a bisphenol-A type vinylester epoxy resin based FRP.
Client
Cobra Instalaciones Industriales
Location
Central Térmica Hidroeléctrica del Cantábrico
Soto de Rivera
Asturias, Spain
Year of Completion
2007