Application
Construction of an absorber and associated feed system in FRP material for a desulphurization plant for a coal-fired power station.
Characteristics
The principal diameter of the pipes was DN1200.
PH Technology was responsible for the installation of the feeder pipes to the absorber, and of the distribution ramps in its interior.
Operating Conditions
The design parameters were a maximum pressure of 9 bar, and a maximum temperature máxima of 100ºC.
Material
The pipes were constructed of FRP, with a bisphenol-A vinylester eposy resin.
Client
Initec Energía
Location
Central Térmica Endesa
Carboneras, Almería
Spain
Year of Completion
2009